James Heys Recycling

James Heys Recycling


Project:  This recycling centre had big deep pot holes in their concrete yard floor. We reinstated the concrete and constructed a like for like basis with reinforcing wire, because the concrete bays were affected by the tide and could rise or fall if not properly tied in to the existing. It also had a big spongy area where they parked their lorries, this caused the vehicles to become stuck in wet weather. So we excavated the entire area and installed Geo text and back filled with crushed concrete and fully compacted it with a 120 Bomag twin drum roller.


Cost: £39’000.00+


Time: July 2016 – October 2017